Outdoor engineering networks
-
Add to wishlist
Segmental 90° /without pressure relief/
PE for water and sewer pipe fittings. Sew-K-100/AA/DN/BB (AA = SDR; DN - connection diameter; BB - elasticity class)
Dimensional tolerance:
- DN 90 - 315 ± 1 cm;
- DN 355 - 630 ± 2 cm;
- DN 710 - 1200 ± 5 cm.
-
Add to wishlist
Segmentinis 90° /standartinis/
PE for water and sewer pipe fittings. Sew-K-100/AA/DN/BB (AA = SDR; DN - connection diameter; BB - elasticity class)
Dimensional tolerance:
- DN 90 - 315 ± 1 cm;
- DN 355 - 630 ± 2 cm;
- DN 710 - 1200 ± 5 cm.
-
Add to wishlist
Segmental 90° route
PE for water and sewer pipe fittings. Sew-K-100/AA/DN/BB (AA = SDR; DN - connection diameter; BB - elasticity class)
Dimensional tolerance:
- DN 90 - 315 ± 1 cm;
- DN 355 - 630 ± 2 cm;
- DN 710 - 1200 ± 5 cm.
-
Add to wishlist
Segmented 90° routing flange
PE for water and sewer pipe fittings. Sew-K-100/AA/DN/BB (AA = SDR; DN - connection diameter; BB - elasticity class)
Dimensional tolerance:
- DN 90 - 315 ± 1 cm;
- DN 355 - 630 ± 2 cm;
- DN 710 - 1200 ± 5 cm.
-
Add to wishlist
Segmental Tripod 90° smooth
Vandentiekio ir kanalizacijos vamzdžių jungiamųjų detalių PE 100 žymėjimo kodas: Sew-T-100/AADN/DN (kur AA = SDR; DN – jungiamosios detalės skersmuo; pvz., Sew-T-100/17-200/200).
– Matmenų nuokrypis DN 90+315 + 1 cm; DN 355+630 + 2 cm; DN 7101200 + 5 cmPE for water and sewer pipe fittings. Sew-K-100/AA/DN/BB (AA = SDR; DN - connection diameter; BB - elasticity class)
Dimensional tolerance:
- DN 90 - 315 ± 1 cm;
- DN 355 - 630 ± 2 cm;
- DN 710 - 1200 ± 5 cm.
-
Add to wishlist
Segmental Y tee
PE for water and sewer pipe fittings. Sew-K-100/AA/DN/BB (AA = SDR; DN - connection diameter; BB - elasticity class)
Dimensional tolerance:
- DN 90 - 315 ± 1 cm;
- DN 355 - 630 ± 2 cm;
- DN 710 – 800 ± 5 cm.
-
Add to wishlist
Septic tanks
The septic tank is a dual chamber clarifier. The working volume of the plant is calculated to allow the water to remain in the plant for three days. The heavy fraction of the wastewater settles, the light fraction floats, and putrefaction and fermentation processes take place. In the last section, the last of the heavy particles are deposited and the treated water is directed to the infiltration field.
The septic tanks have been tested in a certified - notified laboratory and subjected to a comprehensive strength and performance test according to EN12566-1.
- Add to wishlist
- Add to wishlist
- Add to wishlist
- Add to wishlist
- Add to wishlist